ANALISIS PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)

Show simple item record

dc.contributor.author SURAHMAN P, MOCHAMAD RUSLY
dc.date.accessioned 2025-12-15T02:03:48Z
dc.date.available 2025-12-15T02:03:48Z
dc.date.issued 2025-12-10
dc.identifier.uri http://repository.unigal.ac.id:8080/handle/123456789/8295
dc.description.abstract Project control is one of the most important management activities due to the highly complex nature of project-related issues. Therefore, effective management is required to handle such complexity, including for the Cileumeuh–Napel Road Improvement Project in Cilacap Regency, to ensure the project proceeds according to the planned schedule. The objective of this study is to evaluate cost and time performance using the Earned Value Management (EVM) method. The data used in this study include the Budget Plan (RAB), SCurve, Time Schedule, and Weekly Reports. The results of the analysis using the Earned Value Management method show that the schedule performance is less than ideal, with an SPI < 1 and an average SPI of 0.519, indicating poor time performance—meaning the project is delayed and not completed as scheduled. The Cost Performance Index (CPI) is also less than 1, with an average CPI < 1, indicating poor cost performance, as the Actual Cost exceeds the Earned Value. en_US
dc.language.iso en en_US
dc.subject Time Control, Cost Control, dan Earned Value Management (EVM) en_US
dc.title ANALISIS PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) en_US
dc.type Other en_US