<?xml version="1.0" encoding="UTF-8"?><rdf:RDF xmlns="http://purl.org/rss/1.0/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel rdf:about="http://repository.unigal.ac.id:8080/handle/123456789/3222">
<title>Faculty of Engineering</title>
<link>http://repository.unigal.ac.id:8080/handle/123456789/3222</link>
<description/>
<items>
<rdf:Seq>
<rdf:li rdf:resource="http://repository.unigal.ac.id:8080/handle/123456789/8539"/>
<rdf:li rdf:resource="http://repository.unigal.ac.id:8080/handle/123456789/8499"/>
<rdf:li rdf:resource="http://repository.unigal.ac.id:8080/handle/123456789/8495"/>
<rdf:li rdf:resource="http://repository.unigal.ac.id:8080/handle/123456789/8471"/>
</rdf:Seq>
</items>
<dc:date>2026-04-25T11:25:44Z</dc:date>
</channel>
<item rdf:about="http://repository.unigal.ac.id:8080/handle/123456789/8539">
<title>perancangan mesin peragi tape untuk meningkatkan produktivitas produksi</title>
<link>http://repository.unigal.ac.id:8080/handle/123456789/8539</link>
<description>perancangan mesin peragi tape untuk meningkatkan produktivitas produksi
Suhada, Dirma
Tape ketan merupakan makanan tradisional Indonesia yang dihasilkan melalui proses fermentasi beras ketan dengan ragi. Selama ini, proses peragian tape ketan pada Usaha Kecil dan Menengah (UKM) masih dilakukan secara manual sehingga membutuhkan waktu lama, tenaga besar, serta kurang efisien dalam memenuhi permintaan pasar. Penelitian ini bertujuan untuk merancang mesin peragi tape ketan yang mampu meningkatkan produktivitas dan efisiensi proses produksi.Metode penelitian meliputi studi literatur, perancangan konsep, pemodelan dengan perangkat lunak Computer Aided Design (CAD) SolidWorks, serta analisis numerik menggunakan metode elemen hingga (Finite Element Method/FEM). Mesin yang dirancang memiliki kapasitas 15 kg/jam dengan motor bensin berdaya 5,5 HP, sistem transmisi puli, dan pengaduk berbahan stainless steel. Hasil analisis menunjukkan bahwa tegangan maksimum pada rangka sebesar 35 MPa, jauh di bawah tegangan luluh material ASTM A36 sebesar 250 MPa. Faktor keamanan (safety factor) sebesar 7 menunjukkan bahwa konstruksi rangka aman untuk diproduksi.Dengan adanya mesin ini, proses pencampuran ragi dan ketan dapat dilakukan lebih cepat, merata, dan efisien dibandingkan cara manual. Mesin peragi tape ketan diharapkan dapat meningkatkan kapasitas produksi UKM, mengurangi ketergantungan pada tenaga kerja manual, serta mendorong pengembangan industri rumahan sekaligus melestarikan kuliner tradisional Indonesia.
</description>
<dc:date>2026-04-22T00:00:00Z</dc:date>
</item>
<item rdf:about="http://repository.unigal.ac.id:8080/handle/123456789/8499">
<title>EVALUASI PENJADWALAN DAN PENGENDALIAN WAKTU DENGAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (Studi Kasus: Proyek Pembangunan Gedung Kantor Pabrik PT. Macroprima Panganutama Semarang)</title>
<link>http://repository.unigal.ac.id:8080/handle/123456789/8499</link>
<description>EVALUASI PENJADWALAN DAN PENGENDALIAN WAKTU DENGAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (Studi Kasus: Proyek Pembangunan Gedung Kantor Pabrik PT. Macroprima Panganutama Semarang)
Andriansyah, Muhamad Yunus
One of the scheduling methods often used in project scheduling is the Precedence Diagram Method. This construction project experienced a delay in duration from the initial plan of 148 days to 162 days. The objective of this study is to determine the results of time scheduling calculations using the Microsoft Project-based Precedence Diagram Method method and to compile a Precedence Diagram Method network diagram in the Evaluation of Scheduling and Control in the Construction of the PT. Macroprima Panganutama Semarang Factory Office Building. The research method used is a descriptive method with a quantitative approach. &#13;
Based on the Precedence Diagram Method method calculation results using Microsoft Project, the critical path is in the pile cap works for the RCBK building, concrete slab works, steel structure column works, steel structure beam works, steel structure roof accessory works, and iron works, with a total project completion duration of 120 days. To achieve this 120-day duration, three night shifts are added per week, on Tuesdays, Thursdays, and Fridays. The night shifts run from 4:00 PM to 10:00 PM WIB. Another alternative is to accelerate the duration (crashing) by adding three workers, two craftsmen, and one steel craftsman to crash every task on the critical path, resulting in 135 days. According to field data, this project was completed in 162 days, while the project plan was 148 days. In this case, project scheduling using the Precedence Diagram Method method with Microsoft Project is the fastest and most optimal because the project can be scheduled and completed in 120 days.
</description>
<dc:date>2026-04-04T00:00:00Z</dc:date>
</item>
<item rdf:about="http://repository.unigal.ac.id:8080/handle/123456789/8495">
<title>PENERAPAN ALGORITMA C4.5 UNTUK PREDIKSI PRESTASI  SISWA DI MTS PGII BANJAR BERDASARKAN FAKTOR AKADEMIK DAN NON-AKADEMIK</title>
<link>http://repository.unigal.ac.id:8080/handle/123456789/8495</link>
<description>PENERAPAN ALGORITMA C4.5 UNTUK PREDIKSI PRESTASI  SISWA DI MTS PGII BANJAR BERDASARKAN FAKTOR AKADEMIK DAN NON-AKADEMIK
ZULIA, ERVA
Student academic performance is an important indicator for measuring the success of learning processes in educational institutions. This study aims to apply the C4.5 algorithm to predict student performance at MTs PGII Banjar based on academic and non-academic factors. This research uses a quantitative approach with computational experimental methods following the CRISP-DM methodology. The research data were obtained from 652 students of MTs PGII Banjar for the academic years 2021/2022-2023/2024 selected using purposive sampling technique. Research variables include academic factors (subject grades, attendance) and non-academic factors (learning motivation, parental support, socioeconomic status). The C4.5 algorithm implementation was conducted using RapidMiner Studio with parameters of minimum instances per leaf = 5, confidence factor = 0.25, and minimum gain threshold = 0.01. The results show that the prediction model using the C4.5 algorithm achieved an accuracy of 78.68%, precision of 77.84%, recall of 78.12%, and F1-score of 77.98%. The AUC-ROC value of 0.842 indicates excellent model discrimination capability. Validation using 10-fold cross validation demonstrated consistent performance with low standard deviation (0.57%). Information gain analysis shows Mathematics grade as the strongest predictor (0.847), followed by Science grade (0.723), attendance level (0.689), and learning motivation (0.634). The generated decision tree identified 23 classification rules with an average confidence of 84.2% that can be interpreted as an early warning system for identifying at-risk students. This model can be implemented as a decision support system to improve academic management quality through data-driven decision making.
</description>
<dc:date>2025-01-01T00:00:00Z</dc:date>
</item>
<item rdf:about="http://repository.unigal.ac.id:8080/handle/123456789/8471">
<title>ANALISIS KINERJA STRUKTUR GEDUNG BERTINGKAT AKIBAT BEBAN GEMPA DENGAN METODE TIME HISTORY (Studi Kasus : Gedung Fave Hotel Bandar Lampung)</title>
<link>http://repository.unigal.ac.id:8080/handle/123456789/8471</link>
<description>ANALISIS KINERJA STRUKTUR GEDUNG BERTINGKAT AKIBAT BEBAN GEMPA DENGAN METODE TIME HISTORY (Studi Kasus : Gedung Fave Hotel Bandar Lampung)
Thoriq, Moch. Irsyad
Indonesia merupakan Negara yang dikelilingi oleh pertemuan tiga lempeng utama dunia yaitu, lempeng Indo-Australia lempeng Eurasia, dan lempeng Pasifik. Secara geologi, di daerah seperti itu akan banyak dijumpai struktur geologi seperti patah dan sesar. Resiko akibat struktur geologi tersebut yaitu rentan terjadi gempa bumi. Gempa yang kuat dapat menyebabkan bangunan runtuh dan memakan korban jiwa dan gempa terjadi secara tiba-tiba tanpa bisa diprediksi. Oleh karena itu sebaiknya bangunan dibangun dengan konsep bangunan tahan gempa. Penelitian ini bertujuan untuk mengetahui tingkat kinerja struktur gedung. Analisis yang di gunakan yaitu anailisis dinamik dengan metode riwayat waktu (Time History). Kemudian dilakukan evaluasi kinerja struktur terhadap gempa rencana dengan menggunakan metode spektrum kapasitas (ATC-40). &#13;
Desain penelitian yang digunakan Adalah deskriptif kuantitatif dengan studi kasus gedung Fave Hotel Bandar Lampung. Penelitian dilakukan dengan pemodelan 3 (tiga) dimensi dan kemudian dilakukan analisis struktur menggunakan analisis respon riwayat waktu (Time History). &#13;
Berdasarkan hasil analisis didapat nilai simpangan lateral maksimum yang terjadi akibat beban  gempa menggunakan metode riwayat waktu yaitu sebesar 59.10 mm untuk arah X dan 73.40 untuk arah Y. Adapun kinerja struktur gedung Fave Hotel Bandar Lampung akibat beban gempa respons spektrum maupun Riwayat waktu berdasarkan ATC-40 dengan nilai maksimum total drift lantai atap sebesar 0.0018 dan maksimum inelastic drift lantai atap sebesar 0.0018 menunjukkan level kinerja Struktur termasuk dalam level Immediate Occupancy (IO).
</description>
<dc:date>2001-04-04T00:00:00Z</dc:date>
</item>
</rdf:RDF>